Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Sato, Susumu; Tomisawa, Tetsuo; Akikawa, Hisashi; Ueno, Akira; Lee, S.*; Igarashi, Zenei*; Ikegami, Masanori*; Toyama, Takeshi*; Kamikubota, Norihiko*
Proceedings of 2005 Particle Accelerator Conference (PAC '05) (CD-ROM), p.2777 - 2779, 2005/00
The J-PARC LINAC requires for fine control of beam position to minimize beam loss. So that BPMs need to be calibrated with the accuracy of about a hundred micro-meters. The accuracy of BPMs are calibrated with the calibration tool and real beam. In this paper, details of these developments around BPMs are to be reported.
Sato, Susumu; Tomisawa, Tetsuo; Hiroki, Fumio; Lee, S.*; Igarashi, Zenei*; Ikegami, Masanori*; Ueno, Akira; Kondo, Yasuhiro; Hasegawa, Kazuo; Toyama, Takeshi*; et al.
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.467 - 469, 2004/08
As a joint project of KEK and JAERI, a MW class of high intensity proton accelerator (J-PARC), consisting of Linac, 3 GeV-RCS, 50 GeV-MR, is under construction. For this accelerator, it is required to minimize the beam loss (typically, lower than0.11 W/m at the linac). To achieve the requirement, beam trajectory needs to be controlled with accuracy of some 100 m. The first stage of the acceleration (up to 181 MeV during the first stage of construction) is done by linac. The beam position monitor (BPM) in the linac utilizes 4 stripline pickups (50 ohm) on the beam transportation chamber. In this paper, systematic calibration of the BPM is described.
Sato, Susumu; Igarashi, Zenei*; Lee, S.*; Tomisawa, Tetsuo; Hiroki, Fumio; Kishiro, Junichi; Ikegami, Masanori*; Kondo, Yasuhiro; Hasegawa, Kazuo; Ueno, Akira; et al.
Proceedings of 22nd International Linear Accelerator Conference (LINAC 2004), p.429 - 431, 2004/00
As a joint project of KEK and JAERI, a MW class of high intensity proton accelerator (J-PARC), consisting of Linac, 3 GeV-RCS, 50 GeV-MR, is under construction at Tokai, Japan. For this accelerator, it is required to minimize the beam loss (typically, lower than 0.11 W/m at the linac). To achieve the requirement, beam trajectory needs to be controlled with accuracy of some 100 micro-meter. The first stage of the acceleration (up to 181 MeV during the first stage of construction) is done by linac. The beam position monitor (BPM) in the linac utilizes 4 strip-line pickups (50 ohm) on the beam transportation chamber. In this paper, systematic calibration of the BPM is described.